Post by mas25ric on Jun 29, 2010 23:42:14 GMT -5
I noticed on my way to work today that suddenly a practically finished Krystal restaurant building "popped" up across from the Police Services Center on Amnicola. It wasn't there Saturday but today it was. Not sure when it's opening, but at the rate in which they're building it.......probably Friday.
|
|
Bryan Stone
Full Forumite
I'll give it six months.
Posts: 1,993
|
Post by Bryan Stone on Jun 30, 2010 0:51:14 GMT -5
i gotta say. a krystal in front of the Police Center is a horrible idea for late night sales. nobody eats that crap sober
|
|
|
Post by cman8525 on Jun 30, 2010 1:40:50 GMT -5
It could be a plan to crack down on DUI's.... "bravo" "bravo"
|
|
|
Post by daworm on Jun 30, 2010 16:49:02 GMT -5
I saw the ground broken last Wednesday. Are they building them out of pre-fab components these days?
|
|
TNBear
Senior Forumite
Posts: 2,285
|
Post by TNBear on Jun 30, 2010 19:12:30 GMT -5
I now drive that stretch of Amnicola Hwy back and forth everyday. I had wondered over the last year or so I have been doing so why there was not a Krystal. I must admit that I have not noticed the construction, but it is dark when I drive in and it's traffic city on the trip home.
|
|
|
Post by exccinsider on Jun 30, 2010 20:36:20 GMT -5
I was by there last week and didn't notice anything, then today sure enough a nearly-done Krystal building. I thought I had just missed all the construction but I guess not!
|
|
|
Post by mas25ric on Jun 30, 2010 23:37:59 GMT -5
pre-fabricated would be a yes! I heard they were going to an all drive in & drive thru model with no dining room or walk in capability. Not sure yet if this will be that way.
|
|
www.nooganews.com
Full Member
Visit www.nooganews.com for Chattanooga's News!
Posts: 190
|
Post by www.nooganews.com on Jul 1, 2010 7:29:12 GMT -5
Maybe they should put a drive-thru Krispy Kreme there as well. Cops have to eat too!!!
|
|
|
Post by cadillacdude1975 on Jul 31, 2010 20:40:48 GMT -5
pre-fab? no. they can build one of those Krystals in about a month weather permitting. that is about how long it took them to build the one on Signal Mtn road 4 years back. the old drive through wsa demolished right before halloween and the new one was open in mid december.
it was actually ready a week before it opened, but the sig mtn road contruction was still in the way and that was the reason for the new building. well that and walmart. they expected it to bring HUGE sales to that store and it didnt do shit.
the last week we were open as the drive through only, we did $9900 bucks business. the build to the full size seemed great the first couple of weeks, it averaged about 28k for the first month, but has now leveled off to around 20 to 22k a week now.
the 2 biggest mistakes krystal has made is one, when the dead bank store was remodeled a few years back, that building should have been torn to the ground and a new one built on morrison springs road on the vacant lot between the dead bank swimming pool and the freeway. they would have made a killing. i would stand in the parking lot every morning and watch traffic come off morrisons springs and go up ashland terrace. if they had built by the freeway, tons of cash.
the second one is not putting a store in big ridge. bad mistake. oh well, cant tell them everything.
|
|
|
Post by fftspam on Jul 31, 2010 21:45:32 GMT -5
|
|
|
Post by Tsavodiner on Jul 31, 2010 22:24:25 GMT -5
"Where Appetites Go to Die".
|
|
|
Post by cadillacdude1975 on Aug 1, 2010 1:03:48 GMT -5
well i stand corrected and i will be damned. want to bet it will have a roof leak in 6 months?
|
|
|
Post by fftspam on Aug 3, 2010 22:50:46 GMT -5
6th rainfall.. Remember you need to allow time for the water to soak the ceiling/attic area before it starts to actually drip inside the building.
|
|